SDIC Panjiang
SDIC Panjiang Power Generation Co., Ltd. was registered in Liupanshui City, Guizhou Province in February 2009 with a registered capital of $516 million and is controlled by SDIC Power Holdings Co., Ltd. The Panbei Low Heat Value Coal-fired Power Plant (2×300 MW) is a low heat value coal-fired power plant developed and constructed in response to the national industrial policy of 'prioritizing the development of projects for comprehensive utilization of coal resources, energy conservation, and environmental protection,' and 'closed-loop economy' projects, July 2011. Construction started, Unit 1 was put into operation on July 11, 2013, and Unit 2 on December 17, 2014. The main fuels used at the Panbei Power Plant are coal slime and empty coal. The annual average amount of coal slime and empty rock mixture accounts for 80% of the total fuel (up to 100%), the largest among similar units in the country. It is at the leading level. The comprehensive utilization of coal slime and empty rock has made a significant contribution to stabilizing clean coal production at coal mining enterprises, reducing the accumulation of coal slime and empty rock, reducing the risk of secondary pollution, increasing the effective land use area, and so on, and creating a good society. Benefits, environmental protection advantages, obtaining a number of patents for low-heat-value coal blending, obtaining the 'May 1st Labor Certificate of Guizhou Province,' 'Advanced Unit of Green Energy Construction in Guizhou Province,' and 'Guizhou Province's Most Socially Responsible Enterprise.' Other honorary titles at the provincial, municipal, and higher levels.
SDIC Qinzhou
SDIC Qinzhou Power Generation Co., Ltd. была основана 8 января 2004 года. Это компания с ограниченной ответственностью, состоящая из SDIC Power Holdings Co., Ltd. и Guangxi Investment Group Co., Ltd. с соотношением собственного капитала 61:39. В основном он отвечает за строительство и эксплуатацию электростанции Циньчжоу. Долгосрочное видение электростанции Циньчжоу заключается в строительстве отечественной первоклассной крупной тепловой электростанции мощностью 2×600 МВт+6×1000 МВт и общей мощностью 7200 МВт. В настоящее время завершены проект первой очереди сверхкритических энергоблоков мощностью 2×630 МВт и проект второй очереди сверхкритических энергоблоков мощностью 2×1000 МВт. С момента ввода блоков в эксплуатацию совокупная выработка электроэнергии составила 72,776 млрд. киловатт-часов (по состоянию на 31 марта 2019 г.).Главная сеть «Электричества на Восток» обеспечивает чрезвычайно мощное энергообеспечение.Являясь масштабной комплексной энергетической базой в Гуансийском автономном районе, она стала энергетической платформой и мощным двигателем на развитие и строительство залива Бэйбу!
SDIC Qinzhou Power Generation Co., Ltd. was established on January 8, 2004. It is a limited liability company consisting of SDIC Power Holdings Co., Ltd. and Guangxi Investment Group Co., Ltd. with a capital ratio of 61:39. It is mainly responsible for the construction and operation of the Qinzhou Power Plant. The long-term vision of the Qinzhou Power Plant is to build a domestically first-class large-scale thermal power plant with a capacity of 2×600 MW + 6×1000 MW and a total capacity of 7200 MW. Currently, the projects of the first phase of ultra-supercritical generating units with a capacity of 2×630 MW and the second phase of ultra-supercritical generating units with a capacity of 2×1000 MW have been completed. Since the units were put into operation, the total electricity generated has reached 72.776 billion kilowatt-hours (as of March 31, 2019). The main network 'East Electric Power' provides extremely powerful energy supply. As a large-scale comprehensive energy base in the Guangxi Zhuang Autonomous Region, it has become an energy platform and a powerful engine for the development and construction of the Beibu Bay!
Chinese Electric Power
Xiamen Huaxia International Power Development Co., Ltd. (hereinafter referred to as Huaxia Power) was established in July 1994 with SDIC Power Holdings Co., Ltd. as the controlling shareholder. The company has a registered capital of 10.22 billion yuan and is mainly engaged in thermal power generation, electricity supply, heat production and supply, wind power generation, etc. In total, four subcritical coal-fired power plants with a capacity of 300 MW each are installed in the first and second phases of the Songyu Power Plant, operated and managed by Huaxia Electric Power. Two units of the first phase project were put into commercial operation in October 1996 and July 1997, respectively. In July 2000, they were awarded the title of 'First-class Thermal Power Plant' by the State Power Company. The construction of the second phase of the project began in June 2005. Both units were put into industrial operation in March and August 2006, respectively. Huaxia Electric Power has achieved good results in production safety, operation and management, energy conservation and environmental protection, innovative development, and improvement of quality and efficiency. The company has successfully won the 'National May 1st Labor Certificate,' 'Advanced Mass Party Organization of Central Enterprises,' 'Labor Relations of Fujian Province,' 'Harmonious Enterprise,' 'Advanced Enterprise in the Comprehensive Reduction of Major Pollutant Emissions in Fujian Province,' and other honorary titles. It has repeatedly been recognized as the winner of the national 'Ankang Cup' competition, the civilized unit of Fujian Province, the leading taxpayer of Fujian Province, etc., which is very important for the development of electric power in Fujian Province. Industrial development and economic construction have played a positive role.
SDIC Meizhou Bay
SDIC Genting Meizhou Bay Electric Power Co., Ltd. is a Sino-foreign joint venture for thermal power production, with joint investments from SDIC Power Holdings Co., Ltd. and Fujian Electric Power (Hong Kong) Co., Ltd., a subsidiary of the Malaysian Genting Group and SDIC Power Holdings. The company has a total of four coal-fired power blocks, divided into first and second phases, with a total installed capacity of 2786 MW. Construction of the first phase of two imported subcritical energy blocks with a capacity of 393 MW began on March 6, 1998, and was completed and put into operation on March 20, 2001. This was the first power block in China fully owned by foreigners, adopting the BOT operation model. Construction of the second phase of two highly efficient ultra-supercritical domestic energy blocks by Shanghai Electric with a capacity of 1000 MW began on February 6, 2015, was fully completed, and commenced operation in September 2017. This was the first phase of SDIC Power adopting the EPC (engineering, procurement, and construction) general contracting model for construction projects.
SDIC Panjiang
Tianjin company SDIC Jinneng Power Generation Co., Ltd. (referred to as SDIC Beijiang Power Plant) was founded in March 2004. It is one of the first batch of pilot projects of national economy closed-loop, approved by the State Council in 2005, and also the first batch of a series of internal seawater projects created by the National Development and Reform Commission.
The project plans to build four ultra-supercritical energy blocks with a capacity of 1000 MW each, running on coal, and a seawater desalination plant with a capacity of 500,000 tons per day. In November 2009, the first phase of the project (2 supercritical energy blocks of 1000 MW each and seawater desalination equipment with a capacity of 200,000 tons per day) was put into commercial operation with a total investment of 12.1 billion yuan. The second phase of the project (2 supercritical energy blocks of 1000 MW each and equipment for seawater desalination of 300,000 tons per day), based on the initial results achieved in the closed-loop economy research and development in the first phase of the project, will further improve various technical and economic indicators and adopt a higher water production coefficient. , seawater desalination equipment with higher efficiency and higher unit power, and the main parameters of the power generation project engine were raised to the highest level in China (28 MPa / 600°C/620°C), reducing coal consumption in condensing mode to 263.3 g/kWh. Considering the supply of 1000 tons/hour of heating gas and 1400 tons/hour of industrial gas, the average annual thermal efficiency of the entire plant will be increased to 65.6%, and the equivalent equipment operating time can be increased to 6300 hours. The project was put into operation in June 2018. Commercial operation.
The Beijiang Power Plant of SDIC can provide electricity, heat, fresh water, land, pickle products, construction materials, and other energy support for the economic and social development of Tianjin, implementing cascade energy utilization and comprehensive zero emissions, and realizing the integration of enterprises, society, and Harmonious development - this is a demonstration project of the closed-loop economy, as well as a resource-saving and environmentally friendly project that maximizes resource utilization, minimizes waste emissions, and optimizes economic benefits.
Our pride
Our main office
Contact us
SDIC Electric Power Holdings Co., Ltd.
Address: No. 147, South Sichjimen Street, Sichen District, Beijing.
Zip code: 100034
Email: gtdl@sdicpower.com
Website: www.sdic-power.com
Investor Relations Hotline: 010-88006378