Guangxi
SDIC Guangxi Wind Power Co., Ltd. was founded in January 2016. It is mainly responsible for the engineering construction, production operation, and technical maintenance of the Qingzhou Pubei Lunmen wind power project, as well as the development and construction of subsequent projects.
The SDIC Guangxi Pubei Lunmen Wind Farm is located on the Uxuan Mountain ridge between the cities of Lunmen, Beitun, and Baishishui in Pubei County. Its installed capacity is 94 MW. Construction officially began in June 2017, and all units were commissioned for operation in February 2019.Yunnan
SDIC Yunnan Wind Power Co., Ltd. was founded in May 2012. It is mainly responsible for the production, operation, and technical maintenance, engineering construction, and subsequent development of wind and photovoltaic projects in Yunnan Province. As of 2019, 144 MW of installed wind power capacity and 340 MW of installed photovoltaic system capacity have been put into operation.
1. The first phase of the Dongchuan Wind Power project is located in Inyu Village, Tundu Town, Dongchuan District, Kunming City. The installed capacity is 48 MW and was fully commissioned in August 2015. The Dongchuan Wind Power Phase II project is adjacent to Phase I with an installed capacity of 48 MW and was fully commissioned in August 2017.
2. The SDIC Wuding March Mountain Wind Power project is located on the peak of the ridge at the junction of Bailu and Gaocao Townships, Wuding County, Chuxiong Yi Autonomous Prefecture. Its installed capacity is 48 MW. All units were commissioned in January 2017.
3. The Binchuan Photovoltaic Project is located in Dali City, Binchuan County, Dali Prefecture, Yunnan Province. The installed capacity of the first phase is 20 MW, and all photovoltaic modules were put into production on May 11, 2016. The installed capacity of the second phase is 20 MW, and all photovoltaic modules were put into production in May 2018.4. The Nanzhuan Photovoltaic Project is located in Nanzhuan and Chake Townships, Jiangshui County, Hunhe Prefecture, Yunnan Province, with an installed capacity of 300 MW. All photovoltaic modules were put into production in May 2016.
Ningxia
In Ningxia, 1 wind power project and 1 photovoltaic project with an installed photovoltaic capacity of 30 MW are mainly being implemented.
1. SDIC Shizuishan Photovoltaic Power Generation Co., Ltd. was founded in September 2009. It is mainly responsible for the production, operation, and technical maintenance of the grid-connected Shizuishan photovoltaic power station, as well as the development and construction of subsequent photovoltaic projects in Ningxia. The Shizuishan Photovoltaic Power Station is located in Shizuishan City, Ningxia Hui Autonomous Region. The installed capacity of the first phase is 10 MW, and all photovoltaic modules were put into production in January 2011. The installed capacity of the second phase is 20 MW, and all modules were put into production in July 2012.
2. SDIC Ningxia Wind Power Co., Ltd. was founded in January 2012 and is responsible for the engineering construction, production operation, and technical maintenance of the Zhongning Wind Power Station, as well as the development and construction of subsequent wind energy projects in Ningxia. The Zhongning Enhe Wind Power Project has an installed capacity of 50 MW. Construction started in April 2019, and commissioning is planned for 2020.
Qinghai
In Qinghai, 1 wind power project and 1 photovoltaic project are mainly being implemented, with installed wind power capacity of 99 MW and installed photovoltaic capacity of 50 MW.
1. SDIC Qinghai Wind Power Co., Ltd. was founded in December 2011. It is mainly responsible for the engineering construction, production operation, and technical maintenance of the Qinghai Lunan Wind Power Station in Lunan Village, as well as the development and construction of subsequent wind energy projects in Qinghai. The Qinghai Lunan Wind Farm is located in Junciya Town, Dulan County, Haixi Prefecture, Qinghai Province, with an installed capacity of 49.5 MW. All wind turbines were commissioned in January 2014. The Qinghai Baikela Wind Farm is adjacent to the Lunan Village Wind Farm, with an installed capacity of 49.5 MW. In 2017, all wind turbines were commissioned on August 30 for power generation. The Qinghai Gunhe Wind Farm is located in the Ceji Township, Gunhe County, Hainan Prefecture, Qinghai Province, with an installed capacity of 100 MW. It was approved by the Qinghai Development and Reform Commission in October 2017.
2. SDIC Golmud Photovoltaic Power Generation Co., Ltd. was founded in August 2009. It is mainly responsible for the engineering construction, production operation, and technical maintenance of the large-scale Golmud grid-connected photovoltaic power station, as well as the development and construction of subsequent photovoltaic projects in Qinghai. The first phase of the large-scale Golmud grid-connected photovoltaic power station has an installed capacity of 20 MW, and all photovoltaic modules were put into production in May 2011; the second phase of the project has an installed capacity of 30 MW, and all modules were put into production at the end of December 2011.
Xinjiang
In Xinjiang, 2 wind power projects and 1 photovoltaic project are mainly being implemented, with installed wind power capacity of 648.5 MW and installed photovoltaic capacity of 140 MW.
1. SDIC Hami Wind Power Co., Ltd. was founded in December 2011. It is primarily responsible for the engineering construction, production operation, and technical maintenance of wind and photovoltaic projects in Hami, Xinjiang, as well as the development and construction of subsequent wind projects in Xinjiang. Currently, an installed wind power capacity of 599 MW has been put into operation. Key projects: The installed wind power capacity at Santang Lake in Hami is 49.5 MW, and all units were commissioned in January 2014; The installed wind power capacity at Naomao Lake in Hami is 49.5 MW, and all units were commissioned in December 2015; The installed wind power capacity at Hami Yandun 8A is 200 MW, and all units will be commissioned in June 2019; The installed wind power capacity at Hami Jingxia 5A is 300 MW, and all blocks are planned to be commissioned in 2019; The Hami Jingxia 5B wind power station has an installed capacity of 100 MW, and all blocks are planned to be commissioned in 2020; The Jingxia photovoltaic station has an approved capacity of 50 MW, approved in 2014, and construction will commence in a timely manner according to grid capacity and consumer demand.
2. SDIC Turpan Wind Power Co., Ltd. was founded in May 2013. It is primarily responsible for the engineering construction, production operation, and technical maintenance of the Xiaokao Lake wind power station in Turpan, Xinjiang, as well as the development and construction of subsequent wind projects around Turpan. The Xiaokao Lake wind power station project is located north of Daheyan town in Weitulu Pan, Xinjiang, with an installed capacity of 49.5 MW. All units were commissioned in May 2015.
3. Trina Solar Co., Ltd. Toksun District was founded in November 2013. The Toksun photovoltaic project is located in the photovoltaic industrial park of Kumys city in Toksun County, Turpan Prefecture, Xinjiang. The installed capacity of the first phase is 90 MW, commissioned in December 2014, and the installed capacity of the second phase is 50 MW, commissioned in March 2016.
Gansu
Gansu primarily has 3 wind power projects and 1 photovoltaic project.
1. SDIC Baiyin Wind Power Co., Ltd. was founded in July 2007. It is mainly responsible for the engineering construction, production, operation, and technical maintenance of the Jiangcaitan wind power station in Baiyin, Gansu Province. The total installed capacity of the Jiangcaitan wind power station is 94.5 MW. The wind power station is located in Pinchuan District of Baiyin City. The project is built in two phases: the first phase has an installed capacity of 45 MW, and all units were commissioned in June 2009; the second phase has an installed capacity of 49.5 MW and was launched in March 2013. All generating units were put into operation to generate electricity within a month.
2. SDIC Jiuquan First Wind Power Co., Ltd. was founded in July 2008 and is mainly responsible for the engineering construction, production, operation, and technical maintenance of the Beidaciao Dunfan farm in Guazhou, Gansu. The Beidaciao Dunfan farm is located in Jiuquan City, Guazhou County. The project is built in two phases: the installed capacity of the first phase is 49.5 MW, and all units were commissioned in May 2010; the installed capacity of the second phase is 49.5 MW. 49.5 MW, all generating units were commissioned in October 2010.
3. SDIC Jiuquan Second Wind Power Co., Ltd. was founded in August 2009. It is mainly responsible for the production, operation, and technical maintenance of the second Beidaciao wind power station in Guazhou, Gansu, as well as the development and construction of subsequent projects. The second Beidaciao wind power station is located in Guazhou County, Jiuquan City, with an installed capacity of 201 MW. In March 2011, all units were commissioned to generate electricity.
4. SDIC Dunhuang Photovoltaic Power Generation Co., Ltd. was founded in September 2009. It is mainly responsible for the production, operation, and technical maintenance of the Dunhuang photovoltaic project with a capacity of 28 MW, as well as the development and construction of subsequent photovoltaic energy projects in Gansu. The Dunhuang concession project is located in Cili town, Dunhuang City, Gansu Province, with an installed capacity of 10 MW. All photovoltaic modules were put into production in January 2011. The Dunhuang Phase II project 2 × 9 MW has an installed capacity. capacity of 18 MW, all modules were put into production in August 2012.
Our pride
Our main office
Contact us
SDIC Electric Power Holdings Co., Ltd.
Address: No. 147, South Sichjimen Street, Sichen District, Beijing.
Zip code: 100034
Email: gtdl@sdicpower.com
Website: www.sdicpower-invest.com
Investor Relations Hotline: 010-88006378